1 Introduction
1.1 Background
1.2 Purpose of the Outline CTMP
1.3 Scope of the Outline CTMP
2 Construction Activities
2.1 Overview
2.2 Management of Abnormal Indivisible Loads
2.3 Management of Construction Staff Movements
2.4 Site Accesses
3 Traffic Management Measures
3.2 Road Crossings
3.3 Management of Highway Safety
4 Implementation and Monitoring of the CTMP
5 References

Privacy notice | Cookies notice
◁◁ back
{fddde74a-4d07-4813-93d0-2a4022cdbba1}
Figures ▼
Figure 2.1
Road Network Overview
Figure 2.2
Construction Access Plan
Figure 3.1
Priority Signs on a Two-Lane Single Carriageway Road
Figure 3.2
STOP/GO Signs on a Two-Lane Single Carriageway Road
Figure 3.3
Portable Traffic Signals on a Two-Lane Single Carriageway Road
Figure 3.4
Layout of Signs for Works on Single Carriageway Roads with Diversions
Figure 3.5
Manually Operated STOP/GO Signs and Priority Signs
Figure 3.6
Traffic Control by Means of Portable Traffic Signals at a T-Junction
Figure 3.7
Traffic Control by Means of Three-Way Portable Signals at a T-Junction
Figure 3.8
Haul Route Crossing
Tables ▼
Table 1.1
Key Element Parameters of the Proposed Development
Table 1.2
Proposed Development Indicative Construction Programme
Table 2.1