1 Introduction
1.1 Background
1.2 Purpose of the Outline CTMP
1.3 Scope of the Outline CTMP
2 Construction Activities
2.1 Overview
2.2 Management of Abnormal Indivisible Loads
2.3 Management of Construction Staff Movements
2.4 Site Accesses
3 Traffic Management Measures
3.2 Road Crossings
3.3 Management of Highway Safety
4 Implementation and Monitoring of the CTMP
5 References
◁◁
back
{fddde74a-4d07-4813-93d0-2a4022cdbba1}
Figures ▼
Figure 2.1
Road Network Overview
Road Network Overview
Figure 2.2
Construction Access Plan
Construction Access Plan
Figure 3.1
Priority Signs on a Two-Lane Single Carriageway Road
Priority Signs on a Two-Lane Single Carriageway Road
Figure 3.2
STOP/GO Signs on a Two-Lane Single Carriageway Road
STOP/GO Signs on a Two-Lane Single Carriageway Road
Figure 3.3
Portable Traffic Signals on a Two-Lane Single Carriageway Road
Portable Traffic Signals on a Two-Lane Single Carriageway Road
Figure 3.4
Layout of Signs for Works on Single Carriageway Roads with Diversions
Layout of Signs for Works on Single Carriageway Roads with Diversions
Figure 3.5
Manually Operated STOP/GO Signs and Priority Signs
Manually Operated STOP/GO Signs and Priority Signs
Figure 3.6
Traffic Control by Means of Portable Traffic Signals at a T-Junction
Traffic Control by Means of Portable Traffic Signals at a T-Junction
Figure 3.7
Traffic Control by Means of Three-Way Portable Signals at a T-Junction
Traffic Control by Means of Three-Way Portable Signals at a T-Junction
Figure 3.8
Haul Route Crossing
Haul Route Crossing
Tables ▼
Table 1.1
Key Element Parameters of the Proposed Development
Key Element Parameters of the Proposed Development
Table 1.2
Proposed Development Indicative Construction Programme
Proposed Development Indicative Construction Programme
Table 2.1
Maximum Design Scenario of Temporary Construction Compounds
Maximum Design Scenario of Temporary Construction Compounds
Download